This example features a four-storey office building located in Manchester with 1,600m2 GIA and fully-glazed facades. The separation distances around the building are:
- Offices 20x20 m2.
- 4 storeys – c. 16m.
- Separation distances are; Northern side 11m, Eastern side 20m, Southern side 12m, Western side 15m.
- Glazed façade.
- Occupancy capacity of the building.
- 2 staircases.
![]() |
![]() |
![]() |
Firstly, the impacts of incorporating an automatic sprinkler system on the fire protection measures are demonstrated in Table 6-4. Secondly, cost analysis of the impacts is conducted in Table 6-5.
[Table 6-4 Impact of sprinklers on the required fire protection measures for Building B]
BUILDING B | Without Sprinklers | With Sprinklers |
Fire-rated façade area required |
Northern side (12.5%) = 40 m2 Southern side (0%) = 0 m2 Eastern side (0%) = 0 m2 Western side (0%) = 0 m2 |
Northern side (0%) = 0 m2 Southern side (0%) = 0 m2 Eastern side (0%) = 0 m2 Western side (0%) = 0 m2 |
Stairs minimum width | 1000 mm Stairs area 24m2 per floor | 1000 mm Stairs area 24m2 per floor |
Structural fire protection rating | 60 minutes | 30 minutes |
Dry risers | 1 | 1 |
[Table 6-5 Cost analysis of incorporating sprinklers in Building B]
BUILDING B
Without Sprinklers
With Sprinklers
£0
£97,600
Façade cost14
Non FR façade= 1,240m2 x £600/m2 = £744,000
60min-FR façade= 40m2 x £1,700/m2 = £68,000
Total = £812,000
Non FR façade= 1,280m2 x £600/m2 = £768,000
Total = £768,000
Structural fire protection cost
60min-FR = 1,600m2 x £21.57/m2
= £34,512
30min-FR = 1,600m2 x £12.38/m2
= £19,808
Rental yields derived from changes to net internal area
0 m2
0 m2
1 x £1,500/landing x 4 floors =
£6,000
1 x £1,500/landing x 4 floors =
£6,000
£852,512
£891,408
Total cost impact of sprinklers
Capital cost impact = £38,896 added to the project cost plan by including sprinklers
Verdict: Installing automatic sprinklers in Building B is shown to add cost to the project and would not be recommended when reviewed against the impacts (cost, aesthetics etc.) reviewed herein. Unless there is another requirement requiring their inclusion (business continuity, property protection).
Reference [14] Glazed fire rated façade assumed required for aesthetic reasons by the client.
[edit] Related articles on Designing Buildings
- Automatic fire sprinkler systems: A good practice guide.
- Automatic sprinkler system design and operation.
- Business Sprinkler Alliance.
- Case study A for offices to show where automatic sprinklers have the greatest impact.
- Costs of water automatic sprinkler systems.
- Design benefits of automatic sprinkler systems granted under approved document B
- Drenchers.
- Fire detection and alarm system.
- Fire detector.
- Fire in buildings.
- Fire protection engineering.
- Fire safety design.
- Overview of automatic sprinkler system design and operation
- Sprinkler systems explained: A guide to sprinkler installation standards and rules.
- Sprinklers.
- The cost efficiency of different combinations of fire protection measures.
- The impact of automatic sprinklers on building design.
- Watermist systems for fire protection in domestic and residential buildings DG 534.
Featured articles and news
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.